Student Housing · 2023

Student Residence Village

Four residence halls around a central green, delivered in 20 months and ready for move-in weekend.

Owner
Confidential
Location
U.S.
Market
Student Housing
Delivery
Design-build
Scale
1,320 beds
Completed
2023
The brief

Four residence halls around a central green, delivered in 20 months and ready for move-in weekend.

Move-in weekend cannot slip. Four buildings with 1,320 beds had to be designed, built, furnished and inspected in 20 months. Each hall had to be signed off for occupancy, and the green between them had to be finished too, or students would be carrying boxes through a construction site.

How we built it

The approach.

  1. 01

    Four buildings, one rhythm

    The halls started in staggered sequence, so each trade moved from building to building without stopping.

  2. 02

    Standard rooms, repeated

    A small set of room types let crews learn the work once and repeat it with fewer questions and less rework.

  3. 03

    Inspections as they went

    Floors were inspected as they finished, so no single inspection week stood between the team and occupancy.

  4. 04

    Move-in support on site

    Furniture, keys and life-safety tests were complete ahead of time, and our team stayed through move-in weekend.

The outcome.

1,320Beds
4Residence halls
20 moDesign to move-in
2023Move-in weekend

“The deadline was a moving truck full of parents. We planned every week backward from that driveway.”

Project manager, GilbertLanham
Student Housing