Mixed-Use · 2025

Transit-Oriented Mixed-Use Block

Offices, homes, shops and a public plaza stitched onto a rail station, built without closing the platforms.

Owner
Confidential
Location
U.S.
Market
Mixed-Use
Delivery
CM at-risk
Scale
6 acres
Completed
2025
The brief

Offices, homes, shops and a public plaza stitched onto a rail station, built without closing the platforms.

The six-acre block wraps a working rail station, and trains kept running the whole time. Foundations went in close to live track, and a skybridge had to span the line to connect the buildings. Every activity near the railroad needed agency review, flagging and work windows set around the train schedule.

How we built it

The approach.

  1. 01

    Railroad windows in the schedule

    Track outages and flagging were booked months ahead and built into the CPM schedule as fixed constraints.

  2. 02

    Monitoring near the track

    Vibration and movement sensors watched the rail bed during foundation work, with stop-work limits agreed in advance.

  3. 03

    Skybridge lifted in one night

    The bridge span was assembled off site and set in a single overnight track outage, rehearsed in the model beforehand.

  4. 04

    Retail open as phases finished

    Storefronts and the plaza opened in stages, so commuters gained shops and seating while upper floors were still being built.

The outcome.

6Acres
4Uses on one block
0Platform closures
2025Plaza opened to the public

“The trains set the schedule here, not us. We just made sure we were ready every time a window opened.”

Project executive, GilbertLanham