Newark, NJ · Building since 2013 General contractor · Construction manager · Design-builder CareersMediaPrequalifyProject map
Development · Student Housing

Every bed ready by move-in.

Residence halls, student villages and purpose-built off-campus housing, scheduled backwards from the one weekend every student arrives.

What is really at stake.

01

August does not move

The academic calendar sets the deadline. A building that misses move-in waits a full year to lease up again.

02

Every room must pass

Fire alarm, elevators, access cards and furniture have to be inspected and working in every room before families arrive.

03

Beds are sold early

Rooms are often leased or assigned a year ahead. Owners need dates they can promise to students and parents.

Student Housing

Where we work.

  1. 01

    Residence villages

    Multiple halls around shared green space, delivered as one campus.

  2. 02

    On-campus residence halls

    Suites and traditional halls built on active campuses.

  3. 03

    Off-campus student communities

    Bed-by-bed leased buildings with study lounges and fitness rooms.

  4. 04

    Summer renovations

    Bathroom, life safety and mechanical upgrades finished between terms.

How we run the job.

The capabilities that carry the most weight in this market.

Design-BuildDeliver

Design and construction overlapped to compress the path to move-in.

Design-Manufacture-InstallDeliver

Bathroom pods and wall panels built off site while foundations go in.

Supply Chain ManagementPlan

Furniture and finishes tracked to arrive floor by floor.

Facilities & Transition ManagementOperate

Room-by-room punch, access setup and move-in support.

In practice · Student Residence Village

Four halls, 1,320 beds, 20 months.

The residence village was delivered design-build in 20 months. The four halls were sequenced so crews moved from building to building on a repeating cycle, floors were punched from the bottom up, and inspections and furniture followed the trades so every bed was ready for move-in weekend.

1,320
Beds
20
Months
4
Residence halls

Questions worth asking first.

What if a move-in date is at risk?

We track the critical path weekly against move-in and act early by adding shifts, resequencing floors or pulling prefabrication forward.

Can you build on an active campus?

Yes. We plan logistics, crane picks and noisy work around classes and exams and keep pedestrian routes safe.

Do you handle furniture and move-in readiness?

Our transition team coordinates furniture, room inspections and access cards so every bed is ready when the student arrives.

Student Housing

Planning a student housing project?

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.