Energy · Renewable Energy

Sunlight, stored for after dark.

Solar arrays, battery storage yards and collector substations, built from first pile to commercial operation by teams who plan backwards from the interconnection date.

What is really at stake.

01

Interconnection rules the plan

Grid access, offtake agreements and incentive timing all depend on one energization date. Missing it outweighs almost any line item.

02

Small errors repeat at scale

Thousands of piles and tracker rows mean one layout or torque error multiplies. Quality checks have to keep pace with production.

03

Storage adds a new trade mix

Battery enclosures, power conversion and fire protection bring their own testing and safety steps alongside the solar work.

Renewable Energy

Where we work.

  1. 01

    Utility-scale solar

    Piles, single-axis trackers, modules, DC collection and inverter pads.

  2. 02

    Battery energy storage

    Enclosure foundations, power conversion, fire protection and medium-voltage tie-ins.

  3. 03

    Hybrid solar and storage plants

    Arrays and battery yards built together under one controls strategy.

  4. 04

    Collector substations and gen-tie

    Step-up substations, tie lines and the metering the utility needs to accept power.

How we run the job.

The capabilities that carry the most weight in this market.

Engineer-Procure-Construct (EPC)Deliver

Turnkey EPC from pile testing through energization and commercial operation.

Civil & InfrastructureBuild

Grading, access roads and stormwater controls on large, remote sites.

Supply Chain ManagementPlan

Trackers, modules, batteries and transformers tracked from factory to laydown.

SustainabilityPlan

Erosion control, habitat protection and site restoration built into the plan.

In practice · Solar & Battery Storage Facility

Afternoon sun, sent back after sunset.

The solar and storage facility was delivered under an EPC contract. Arrays were built block by block with daily quality checks, the battery yard was installed and tested in parallel, and both were commissioned against the interconnection date so stored afternoon output could return to the grid after dark.

150 MW
Solar capacity
300 MWh
Battery storage
EPC
Delivery

Questions worth asking first.

How do you keep a large solar site on schedule?

We split the array into blocks with their own crews and track pile, tracker, module and electrical progress daily, block by block.

Can you add storage to an existing plant?

Yes. We plan storage around the operating plant, scheduling tie-ins to limit lost generation.

Do you build the substation and tie line too?

Yes. We build them alongside the array and coordinate testing with the utility so the plant energizes on time.

Renewable Energy

Planning a renewable energy project?

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.