
Every phase. One schedule.
Plan it, deliver it, build it, run it. Bring GilbertLanham in at any stage and every capability works from the same cost model, the same critical path and the same risk register.
- Building since
- 2013
- Capabilities
- 14
- Markets served
- 22
Plan: cost, schedule and risk settled early.
Budget, critical path, carbon and long-lead equipment worked out while the design can still change.
Deliver: a contract shaped to the risk.
Every major contract model, chosen to fit your risk, your procurement rules and your finish date.
DeliverGeneral ContractingOne contract, one accountable team
DeliverConstruction ManagementAt-risk or agency, controls first
DeliverDesign-BuildDesign and build on one schedule
DeliverEngineer-Procure-Construct (EPC)Turnkey delivery to energization
DeliverDesign-Manufacture-InstallMade in the shop, set in the fieldBuild: self-performed work in the field.
GilbertLanham crews and equipment on the concrete, steel, sitework and systems that set the pace.
Operate: ready on opening day and after.
Move-in, operator training, the first warranty year, and a plan ready for the day a storm hits.
Built by a scheduler.
Controls are part of the product
GilbertLanham was founded by a construction manager and project controls professional. The schedule, the cost report and the risk register are deliverables you own, not paperwork we keep.
Decisions while they are cheap
Estimators and schedulers at the design table put real prices and real durations in front of you while there is still time to change course.
Newark-tested logistics
We grew up building in a dense, old, working city where every site is tight and every neighbor is watching. That discipline travels to every job.

Not sure where to start?
Send us the drawings, the budget or just the deadline. We will tell you which capabilities fit, which delivery model protects you best and what we would check first.











