The brief

Maker labs, high-bay test space and project studios that let engineering students build at full scale.

Faculty wanted high-bay test space with a strong floor and an overhead crane, wet and dry labs, and quiet project studios, all under one roof. A strong floor that takes repeated impact loads sits uneasily next to rooms full of sensitive instruments. The program kept growing during design, and the budget did not.

How we built it

The approach.

  1. 01

    Target value from day one

    Every program change was priced within days against a fixed target, so faculty traded features knowingly instead of discovering overruns at bid.

  2. 02

    Loud spaces kept apart

    The high bay sits on its own foundation, separated by a structural joint from the labs and studios that need stillness.

  3. 03

    Building systems left visible

    Ducts, piping and cable tray were routed in the model to stay exposed and labeled, so the building teaches how buildings work.

  4. 04

    Crane and floor load tested

    The bridge crane and strong floor anchors were load tested and certified before the first student project arrived.

The outcome.

126,000Square feet
1Contract for design and construction
0Program changes left unpriced
2023Open to students

“Students will spend four years taking this building apart in their heads. We wanted every pipe and beam to hold up to that.”

Design-build manager, GilbertLanham