K–12 Education · 2022

STEM Middle School

A new middle school for 1,100 students rose next to an occupied campus without one lost instructional day.

Owner
Confidential
Location
U.S.
Market
K–12 Education
Delivery
CM at-risk
Scale
118,000 SF
Completed
2022
The brief

A 1,100-student middle school with robotics labs and flexible classrooms, built beside an occupied campus.

The new building went up a few dozen yards from classrooms full of children. Buses, parent drop-off and recess all crossed the paths construction traffic wanted to use. The district needed the robotics labs and flexible classrooms ready for a fixed opening, and the old building had to stay fully operational until the day students switched over.

How we built it

The approach.

  1. 01

    Site logistics drawn around the bell

    Deliveries, crane picks and concrete pours were scheduled outside arrival, dismissal and recess windows, with flaggers at every crossing.

  2. 02

    A three-week look-ahead with the principal

    Noisy work and testing weeks were coordinated every Monday, so exams never shared a morning with a pile driver.

  3. 03

    Flexible rooms, fixed infrastructure

    Floor boxes, ceiling power and data were laid out on a grid so movable walls and furniture can reconfigure rooms for years.

  4. 04

    Move-in planned like a phase

    Furniture, technology and robotics kits were staged room by room, and teachers had keys a full week before students.

The outcome.

118,000Square feet
1,100Students
0Instructional days lost to construction
2022First day in the new building

“The school schedule was our first schedule. Our own activities were built to fit around it, not the other way around.”

Superintendent, GilbertLanham
K–12 Education

Planning something like this?

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.