Newark, NJ · Building since 2013 General contractor · Construction manager · Design-builder CareersMediaPrequalifyProject map
Newark, New Jersey · Builders and schedulers since 2013

We build what communities run on.

Surgery centers, interchanges, substations, schools and homes, delivered by a builder that treats the schedule as part of the product. One accountable team, a critical path you can read and a cost report with no surprises.

01Baseline the plan02Foundations03Structure & systems04Commission & hand overOn the date
Who we are

We plan it, build it and prove it. Born in Newark in 2013, GilbertLanham builds for owners who need the date to hold.

2013
Building since
14
Delivery capabilities
22
Markets served
4
Sectors

Founded by a scheduler and run like a control room. Self-performed crews, in-house VDC and project controls share one roof in Newark, so the plan and the work never drift apart.

Meet GilbertLanham
Yusuf Balogun, Founder and Chief Executive Officer of GilbertLanham
Yusuf BalogunFounder & Chief Executive Officer
From the founder

“True success is measured not only by what an organization builds, but by the trust it earns.”

Yusuf Balogun built GilbertLanham on a background in construction management, project scheduling, project controls and business operations. His rule is simple: align the people, the process and the resources before the first crew mobilizes, then hold every team accountable to the plan. Visionary leadership. Disciplined execution. Lasting impact.

  • 2013Business roots in Newark, NJ
  • CPMScheduling and project controls
  • CEOStrategy, operations and finance
How we work

The GilbertLanham controls standard.

Four commitments on every job, from a pump station to a 36-story tower. They are how a builder earns the right to promise a date.

  1. 01

    A schedule you can actually read

    Every job runs on a resource-loaded baseline with the critical path in plain view. You see the float, the logic and the dates that matter, not a wall of bars.

  2. 02

    Risk priced before it is built

    Long-lead equipment, ground conditions, permits and tie-ins go into a priced risk register at the first meeting, each with an owner and a mitigation date.

  3. 03

    Cost reported like a public company

    Weekly cost and earned-value reporting tells you what has been spent, what is committed and what the job will cost at completion. No surprises at the last pay app.

  4. 04

    Handover planned on day one

    Commissioning, training and closeout documents are tasks in the schedule from the start, so the keys change hands with a building that already works.

Selected projects

The work, on the record.

2024Healthcare Outpatient Surgery & Imaging PavilionEight operating rooms, a full imaging suite and a same-day recovery unit, connected to a live medical campus by an enclosed bridge.U.S.184,000 SFCM at-risk2025Cultural & Performing Arts Digital Arts & Media CenterA screening theater, immersive gallery and broadcast studios inside a sculpted shell with no two panels alike.U.S.96,000 SFCM at-risk2025Sports & Entertainment Collegiate Ballpark ComplexA baseball and softball complex delivered between two seasons, ready for the first pitch of conference play.U.S.6,500 seatsGeneral contracting2024Highways & Roads Interstate Interchange ReconstructionA cloverleaf interchange rebuilt as a modern system interchange, with every lane kept open at rush hour.U.S.7 rampsDesign-build2025Airports Airfield Apron & Terminal ModernizationA rebuilt apron, a new baggage hall and upgraded gates, phased so no airline lost a single departure slot.U.S.22 acresCM at-risk2025Renewable Energy Solar & Battery Storage FacilitySolar arrays paired with a battery yard that stores the afternoon peak and sends it back to the grid after sunset.U.S.150 MW / 300 MWhEPC2025Mixed-Use Transit-Oriented Mixed-Use BlockOffices, homes, shops and a public plaza stitched onto a rail station, built without closing the platforms.U.S.6 acresCM at-risk2023Higher Education Engineering Innovation HallMaker labs, high-bay test space and project studios that let engineering students build at full scale.U.S.126,000 SFDesign-build2022K–12 Education STEM Middle SchoolA 1,100-student middle school with robotics labs and flexible classrooms, built beside an occupied campus.U.S.118,000 SFCM at-risk
What we do

Fourteen capabilities. One schedule.

Plan, deliver, build and operate, all staffed by one company and tied to one critical path. Call us at concept, on bid day or ten years after handover.

03BuildSelf-performed work in the field
3 capabilities
04OperateReady on opening day and after
2 capabilities
Safety & quality

Nobody gets hurt. No exceptions.

A schedule that only works if someone takes a risk is a bad schedule. We plan hazards out of the sequence before crews mobilize, and every person on site, in any trade, can stop the work.

Stop-work authorityAny person, any trade, no penalty
Pre-task planningEvery crew, every shift, in writing
First-work checksInspect the first piece before the hundredth
How we deliver

Pick the contract that matches the risk.

The delivery model decides who carries cost, schedule and design risk. We build under all six, and we will tell you which one protects your project before anything is signed.

General contracting

How risk is shared
We carry price and schedule risk against a completed design
Best for
Owners with finished drawings who want one firm number
Explore general contracting

CM at-risk

How risk is shared
We join while design is moving, price it as it develops and commit to a GMP
Best for
Phased, complex or occupied sites where early input pays for itself
Explore cm at-risk

Design-build

How risk is shared
Designer and builder sign one contract and answer to you as one team
Best for
Owners who value speed and a single point of accountability
Explore design-build

EPC

How risk is shared
We engineer, procure and construct for a fixed price tied to a performance guarantee
Best for
Power, process and industrial plants with output targets
Explore epc

Design-manufacture-install

How risk is shared
Assemblies are drawn for the factory, built off site and set by our crews
Best for
Repeatable rooms, tight urban sites and compressed schedules
Explore design-manufacture-install

Public-private partnership

How risk is shared
Design, build, finance and sometimes operate under one long-term agreement
Best for
Public agencies delivering infrastructure meant to serve for decades
Explore public-private partnership
Partner with us

Good partners make good schedules.

Trade contractors, suppliers, joint-venture partners and public agencies. Show us your work and your safety record. We will show you fair terms, a planned site and payments you can count on.

Build with GilbertLanham
Start a conversation

Bring us the date that cannot move.

Tell us the project, the site and the deadline. A senior GilbertLanham builder will read it and reply within one business day with real questions and a first view on delivery.