Newark, NJ · Building since 2013 General contractor · Construction manager · Design-builder CareersMediaPrequalifyProject map
Projects · Selected work

The schedule, delivered.

Surgery centers, interchanges, ballparks, power plants and neighborhoods. Every owner here is confidential. Every date we promised them is not. This is how GilbertLanham builds.

Sector
Delivery
19 projects
2024Healthcare Outpatient Surgery & Imaging PavilionEight operating rooms, a full imaging suite and a same-day recovery unit, connected to a live medical campus by an enclosed bridge.U.S.184,000 SFCM at-risk2023Higher Education Engineering Innovation HallMaker labs, high-bay test space and project studios that let engineering students build at full scale.U.S.126,000 SFDesign-build2022K–12 Education STEM Middle SchoolA 1,100-student middle school with robotics labs and flexible classrooms, built beside an occupied campus.U.S.118,000 SFCM at-risk2024Justice & Public Safety Public Safety HeadquartersA hardened headquarters for police, fire and 911 dispatch that has to stay on through any storm.U.S.164,000 SFDesign-build2025Cultural & Performing Arts Digital Arts & Media CenterA screening theater, immersive gallery and broadcast studios inside a sculpted shell with no two panels alike.U.S.96,000 SFCM at-risk2025Sports & Entertainment Collegiate Ballpark ComplexA baseball and softball complex delivered between two seasons, ready for the first pitch of conference play.U.S.6,500 seatsGeneral contracting2023Federal Secure Data Operations CenterA federal data and operations facility with layered perimeter security, 2N power and a 24-hour operations floor.U.S.210,000 SFDesign-build2024Commercial Corporate Headquarters RepositioningAn occupied office tower rebuilt floor by floor into a modern headquarters, while the tenant kept working above and below.U.S.18 floorsGeneral contracting2024Highways & Roads Interstate Interchange ReconstructionA cloverleaf interchange rebuilt as a modern system interchange, with every lane kept open at rush hour.U.S.7 rampsDesign-build2025Airports Airfield Apron & Terminal ModernizationA rebuilt apron, a new baggage hall and upgraded gates, phased so no airline lost a single departure slot.U.S.22 acresCM at-risk2023Water & Environmental Stormwater Pump Station & Treatment UpgradeA flood-protection pump station and treatment upgrade built inside a working plant during two hurricane seasons.U.S.120 MGDEPC2024Industrial Infrastructure Port Cold Storage & Logistics TerminalA freezer and cooler warehouse beside a container port, with 64 dock doors and a rail spur to the berth.U.S.640,000 SFDesign-build2025Renewable Energy Solar & Battery Storage FacilitySolar arrays paired with a battery yard that stores the afternoon peak and sends it back to the grid after sunset.U.S.150 MW / 300 MWhEPC2024Power & Utilities Grid Control Center & SubstationA new regional control room and a rebuilt 230 kV substation, cut over with the lights on across the service area.U.S.230 kVEPC2023Energy Infrastructure Combined-Cycle Plant UpgradeTurbine, piping and controls upgrades delivered inside one planned outage window, with the unit back online early.U.S.620 MWEPC2024Affordable & Mixed-Income Housing Mixed-Income Garden ApartmentsGarden-style homes around shared courtyards, with half the apartments set aside for working families.U.S.248 homesGeneral contracting2025Multifamily High-Rise Rental TowerA 36-story rental tower with a rooftop pool and hotel-grade amenities, topped out a month ahead of plan.U.S.36 storiesDesign-build2023Student Housing Student Residence VillageFour residence halls around a central green, delivered in 20 months and ready for move-in weekend.U.S.1,320 bedsDesign-build2025Mixed-Use Transit-Oriented Mixed-Use BlockOffices, homes, shops and a public plaza stitched onto a rail station, built without closing the platforms.U.S.6 acresCM at-risk
Start a conversation

Your project could be next.

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.